Construction of Basti Ring Road (Phase-I) with four lane configuration (Design length 22.150 Km) for Basti City in the state of Uttar Pradesh on (HAM)Hybrid Annuity Mode.
State : Uttar Pradesh
Length : Design length 22.150 Km
Date of Start : 12-06-2025
Project Cost : INR 570.91 Cr.
Commissioned Under : Ministry of Road Transport and Highways (MoRTH)