Construction of Shohratgarh Bypass (Design Length 6.273 Km) to two lane with paved shoulder on NH-730(starts near ch. 413.700 and ends near ch.41.900) under Engineering, Procurement and Construction (EPC) mode in the State of Uttar Pradesh
State : Uttar Pradesh
Length : Design Length 6.273 Km
Date of Start :
Project Cost : INR 75.91 Cr.
Commissioned Under : Ministry of Road Transport and Highways (MoRTH)